Residents,
Rectification works on the building’s air conditioning pipework are required to be undertaken as part of the building defects rectification program. This work is being carried out by the original installers of the system.
These works will resolve the issue of Levels 4 and 5 not having their air conditioning functioning.
To complete these works, all air conditioners on Levels 20 and 21 will be off line for the duration of the works. There is a possibility that other levels may need to be taken off line also, but this is an unknown until the works commence. All residents should assume that their air conditioning systems will not be functioning for the duration of the works. If your level ends up not having to be taken down – it’s will be a bonus!
We have left this work purposely till mid to end of September when the weather is warmer. Hopefully the weather does not take a turn, unusually.
Work will commence on Monday 18th September 2017 at 7am.
Work will continue all week and may go into the early part of the following week – dependent on the unknown…
The Level 21 lobby area will be the epicentre of works, and will be quite intrusive – our apologies for this in advance to Level 21 residents.