Skip to content

Aspire Apartments – SYDNEY CBD

Owners and Residents Information

Menu
  • About Aspire Apartments
  • Blaq Piq Café
  • By-Laws/Strata Living
  • Vehicle/Bike Parking
  • Living in Aspire
  • Location/Contact
  • Aspire Management
  • Manuals/Compliance
  • Moving IN/OUT
  • Rental Laws
Menu

Category: Building works

Carpet Cleaning – Wed 27th Feb 2019

February 21, 2019February 21, 2019

Greetings All Residents, I’ve arranged to have carpet cleaned in corridors on all levels (where there is carpet laid).  This is happening on Wednesday morning next week (27 February). The carpets will obviously be wet after cleaning has been completed (3-5 hours). Please take care during this drying period, as the carpet stains much easier…

Read more
Categories: Building works

Exterior Building/Glass Cleaning – 3rd Jan to 10th Jan 18

December 14, 2017December 16, 2017

Greetings Residents, Exterior Building/Glass Cleaning Commencing Wednesday 3rd January 2018, High Rise Solutions will commence cleaning all exterior glass, metal louvres.  These works are long overdue, and it is important that we are able to access all areas to do a complete and thorough clean. It is envisaged that the cleaning works will take 1…

Read more
Categories: Building works / General information

Air Conditioning Repairs

September 2, 2017September 2, 2017

Residents, Rectification works on the building’s air conditioning pipework are required to be undertaken as part of the building defects rectification program.  This work is being carried out by the original installers of the system. These works will resolve the issue of Levels 4 and 5 not having their air conditioning functioning. To complete these…

Read more
Categories: Building works / General information

Garbage Room Works

May 25, 2017May 25, 2017

Residents, Commencing Thursday 1st June 2017 (next week), the garbage room will undergo some modifications. From 7am on Thursday 1st June 2017, through to approx. 5pm Saturday 3rd June 2017, inclusive, the garbage chutes on each floor will be locked off, and the garbage room will not be accessible. Temporary bins for general waste (red…

Read more
Categories: Building works / Garbage Room

100% Compliance – Annual Fire Inspection

May 19, 2017May 25, 2017

Congratulations Residents!  On Thursday 18th May 2017, we achieved a 100% success rate in terms of access to apartments, performing the compulsory annual fire inspection. This is really unheard of in most buildings, and a testament to you helping us manage our building really well. Our contractors have replaced all batteries within smoke detectors throughout…

Read more
Categories: Building works / General information

Building Works – 18 May 2017

May 9, 2017May 11, 2017

Residents, On Thursday 18th May 2017 from 7am through to mid-afternoon – access into the car park will not be possible. Work will be done on broken louvres, which requires a truck with a working platform arm to be positioned at the northern side lane way. Retrieving cars from the car park will be fine,…

Read more
Categories: Building works

Carpet Cleaning Thur 9th Mar 17

March 4, 2017March 4, 2017

Greetings All Residents, It has been arranged to have the carpet cleaned in corridors on all levels (where there is carpet laid). This is happening on Thursday morning next week (9th March). The carpets will obviously be wet after cleaning has been completed (3-5 hours). Please take care during this drying period, as the carpet…

Read more
Categories: Building works / General information

Pest Control – Thur 9th Feb 2017

January 21, 2017January 21, 2017

Greetings Residents, On Thursday 9th February 2017 between the hours of 7:30am and 4:30pm, Kevin Joyce Pest Control will be conducting a general pest treatment to all common property areas. Please find the attached notice for further information including a special price negotiated for residents that wish to have their apartments treated. This notice has…

Read more
Categories: Building works / General information / Pest Control

REMINDER: Exterior Glass and Louvre Cleaning – 27 Dec 16 (4 days)

December 11, 2016December 13, 2016

Commencing soon Thursday 27th December 2016, High Rise Solutions will commence cleaning all exterior glass and metal louvres.  These works are long overdue, and it is important that we are able to access all areas to do a complete and thorough clean.   This work will take 4 days to complete.   This will include…

Read more
Categories: Building works / General information

Lobby Branding in Place

October 29, 2016October 29, 2016

Recently, we had illuminated signage installed in the main entrance lobby as part of the building branding initiative.   This was achieved rather economically, by in-house design and engaging the right trades to keep the cost down.   This has not only brightened the lobby up somewhat, but also has given a sense of luxury…

Read more
Categories: Building works / General information
  • 1
  • 2
  • Next
© 2026 Aspire Apartments – SYDNEY CBD | Powered by Minimalist Blog WordPress Theme