Get ready for the final touches to the lobby area!

A LOBBY TO ASPIRE TO!

The Executive Committee has been working hard to bring you a lobby fit for the style of building Aspire is.

  • The building management office upgrade has almost been completed:

IMG_1196

In the next week, you will see the final touches being installed in the lobby, to bring it up to Aspirational standards.

  • Round mirrors of different sizes on walls.

IMG_1177 IMG_1200

  • A striking large red oversized vase/sculpture placed into a multicoloured rug positioned in the corner at the end of the mailboxes:

 

IMG_1168

And other small details.

The lobby is about to look a whole lot like an upmarket building, and is long overdue!

Watch this space!

 

Pages:
Edit